In the period we have records for, 2021-2023, sewage has been discharged in, or near (~3mi.), New Gate 2887 time(s). Sewage has been discharged for a total of 11171.2 hour(s). In total: 1.27 year(s)* of elapsed time.
85.1 The stations, on average, have been monitoring for 85.1% of the total time we have data for.
Discharge Volume by Year
Hours and Spills by Year
Uptime Yearly Summary (Average)
Summary of Bodies Receiving Discharge
A Culverted Section Bannister Brook, Tributary Of The River Lostock Bannister Brook Boundary Brook Boundary Brook (Tributary Of The River Ribble) Boundary Brook A Trib Of The River Ribble Boundary Brook Trib Riv Ribble Bow Brook Mill Brook River Darwen River Darwin River Lostock River Lostock Via A Surface Water Sewer River Lostock Via Surface Water Sewer River Ribble River Ribble (Tidal) River Ribble (Tidal) Via A Surface Water Sewer River Ribble Estuarine Waters River Ribble Estuary River Ribble Tidal River Ribble Tidal Via Sws River Ribble Via A Surface Water Sewer River Ribble Via Storm Culvert River Ribble Via Surface Water Sewer Storm Culvert Into R Ribble Storm Culvert, A Tributary Of The River Ribble Storm Culvert,Trib Of Ribble Swillbrook Culvert Swillbrook Culvert A Tributary Of The River Ribble (Tidal) Tidal Ribble River Tribof River Ribble Tributary Of The River Ribble, Via A Surface Water Sewer Unnamed Trib. Of Mill Brook Unnamed Tributary Of Mill Brook
View Summaries Nearby
New Gate - Yearly Summary
Summary for Year 2023
1080 Spills | 4444.8 hours
In 2023, sewage was discharged in, or near (~3mi.), New Gate 1080 time(s). Sewage was discharged for a total of 4444.8 hour(s). In total: 0.5 year(s)* of elapsed time.
96.1 The stations, on average, have been monitoring for 96.1% of the total time in 2023. Stations with missing data have been excluded from this calculation.
A single station may appear twice when there are multiple individual outlets in the top 3.
Summary for Year 2022
857 Spills | 2287.1 hours
In 2022, sewage was discharged in, or near (~3mi.), New Gate 857 time(s). Sewage was discharged for a total of 2287.1 hour(s). In total: 0.26 year(s)* of elapsed time.
79.3 The stations, on average, have been monitoring for 79.3% of the total time in 2022. Stations with missing data have been excluded from this calculation.
A single station may appear twice when there are multiple individual outlets in the top 3.
Summary for Year 2021
950 Spills | 4439.2 hours
In 2021, sewage was discharged in, or near (~3mi.), New Gate 950 time(s). Sewage was discharged for a total of 4439.2 hour(s). In total: 0.5 year(s)* of elapsed time.
79.9 The stations, on average, have been monitoring for 79.9% of the total time in 2021. Stations with missing data have been excluded from this calculation.